Turkish ETS pilot period: scope, monitoring plans and penalties
Turkey's ETS pilot for 2026-2027: who is covered, monitoring methodology plans, verified emissions and activity level reports, free allocation and fines.
Blog
On CBAM, Turkish ETS, TSRS, ISO 14064, water and product footprints; with references to the official texts and the questions that come up in practice.
Latest article
Which chillers, cold rooms, fire suppression and switchgear must be registered in Turkey's EKOMVET, how t CO₂e is calculated, and leak check intervals.
Read articleTurkey's ETS pilot for 2026-2027: who is covered, monitoring methodology plans, verified emissions and activity level reports, free allocation and fines.
CBAM definitive period for Turkish producers: the 50-tonne threshold, default value mark-ups, free allocation adjustment and the 30 September 2027 deadline.
ISO 14067 product carbon footprints: boundary, declared unit, biogenic carbon, how a PCF differs from CBAM embedded emissions, and where the ESPR DPP stands.
How the SBTi CNZS V1.3.1 minimum target is calculated, what V2.0 changes, what the 5% scope 3 rule requires, and how to rank abatement options on a MACC.
Scope 2 in Turkey: ETKB consumption-point factors, why grid losses must not be added again, YEK-G certificates against Table 7.1 and the missing residual mix.
How to calculate a site water footprint: blue, green and grey water, the grey water formula, AWARE scarcity, WFN Manual vs ISO 14046, worked example.
How to choose emission factors: IPCC 2006 defaults, DESNZ 2026, Türkiye's ETKB grid factor, AR5 vs AR6 GWPs, period and country matching, frozen results.
Turkey's TSRS 1 and 2 explained: KGK entity list, 2025+ size thresholds, the two-period rule, Scope 3 relief, the 2027 TSRS 2 amendments and GRI 102.
ISO 14064-1:2018 inventory step by step: boundary, six categories mapped to GHG Protocol scopes, significance, base year, uncertainty and ISO 14064-3 checks.
Every module is open in the demo; it closes by itself after three days.
No credit card · No installation · 3 days full access